CalcMyPool

Pool Chemical Calculator

Enter every test result you have, once. You get one plan: what to add, how much, and in what order, with each dose worked out for the water the step before it leaves behind. Baking soda raises pH, acid lowers alkalinity, stabilizer lowers pH, so the order changes the amounts.

Not sure? Work it out with the pool volume calculator, then come back.

How you chlorinate

Liquid chlorine, bleach or cal-hypo.

Pool
Surface

Plaster also covers concrete, pebble and fiberglass, which need calcium in the water. Vinyl liners do not.

Leave a box empty if you did not test it. Combined chlorine is total chlorine minus free chlorine. A drop kit reads far better than strips.

Water temperature and borates

Both change how far acid or soda ash moves pH. Empty: 80°F and no borates.

Your products

Products: Liquid chlorine 12.5%, muriatic acid, soda ash, baking soda, stabilizer, calcium chloride. Change any that differ.

The Active Ingredient line, for example "Sodium hypochlorite 12.5%". Plain, unscented bleach only.

Acid

Full strength is 31.45%; "half strength" and many low-fume acids are about 14.5%.

Calcium chloride

Calcium hardness increaser. The label says which; most flakes are dihydrate. Anhydrous takes about a quarter less for the same rise.

Baking soda, soda ash and stabilizer granules are taken as 100%, as most labels say.

Your plan

–

  • –in range
  • –need a change
  • –not tested

How it was worked out

To see your plan, enter your test results: free chlorine, pH, total alkalinity, CYA or calcium. Any you tested.

The order to add pool chemicals

Most pool guides agree on the backbone: alkalinity first, then pH, then calcium, with chlorine near the end. This calculator follows that order, with two changes: stabilizer starts first because it takes days to dissolve, and chlorine jumps to the front when it is below the safe minimum.

WhatWhenWhy then
1. StabilizerStart nowSlowest; lowers pH
2. Baking sodaNowTA sets how far pH moves
3. Acid or soda ash6 hours laterTA has mixed in
4. ChlorineEveningApart from the acid
5. Calcium chlorideTomorrowpH in range first

Only the steps your readings need appear in your plan. If free chlorine is below the minimum for your CYA, chlorine goes first: it is the one that keeps the water safe to swim in. If combined chlorine is above 0.5 ppm, a shock replaces the routine chlorine.

Why one dose changes the next

Each chemical moves more than one number, so working them out one at a time, from the same readings, gives the wrong amounts. The calculator carries each change forward:

  • Baking soda raises pH a little as it raises alkalinity. If pH is already high, more acid is needed afterwards, and the calculator counts it.
  • Acid lowers alkalinity as it lowers pH. When both are needed, the baking soda is set a little above the TA target, so TA lands on target after the acid.
  • Soda ash raises alkalinity as it raises pH, so less baking soda is needed.
  • Stabilizer is an acid. Cyanuric acid lowers pH as it dissolves. If pH is high, the calculator lets the stabilizer do part of the work and doses less acid, or none. If pH is low, it waits with the soda ash until the stabilizer has dissolved (unless pH is below 7.2), because soda ash added now would be partly undone.
  • The chlorine target depends on CYA. The calculator uses the CYA the pool will have once the stabilizer is in, not the one you tested.
  • Cal-hypo adds calcium and dichlor adds CYA: about 0.7 ppm of calcium, or 0.9 ppm of CYA, for every 1 ppm of chlorine.
  • Fresh water changes everything. If CYA is too high, the plan stops at replacing water, because every other reading will be different after the refill.

Worked example

A 15,000-gallon plaster pool with liquid chlorine, outdoors. Test results: free chlorine 1, pH 8.0, total alkalinity (TA) 60, CYA 40, calcium 220 ppm. The plan:

  1. Liquid chlorine first: 1 ppm is below 3, the minimum for CYA 40, so 12.5% liquid chlorine goes in first, to 5 ppm: 56,781 L × 4 ÷ 1,000 = 227 g of chlorine ÷ 142.5 g per liter = 1,594 mL, about 54 fl oz.
  2. Baking soda: TA 60 sits at the bottom of the range, and the acid will take some away, so TA goes to about 84 first: 23.7 ppm × 56,781 L ÷ 50.04 × 84.01 mg = 4.98 lb. That also nudges pH from 8.0 to about 8.04.
  3. Muriatic acid, 6 hours later: from pH 8.04 to 7.6 at TA 84 and CYA 40, the acid demand is 3.71 ppm of alkalinity, or 14 fl oz of 31.45% acid. TA ends at 80. Without the baking soda it would be about 10 fl oz, which is why the order matters.
  4. Calcium chloride, tomorrow: 220 to 300 ppm takes 14.7 lb of dihydrate (56,781 L × 80 ÷ 1,000 × 147.01 ÷ 100.09), in 4 doses 12 hours apart.

Target levels we use

TestRangeAim for
Free chlorineby CYA (CYA 40: 5 to 7)bottom of the range
pH7.4 to 7.87.6
Total alkalinity60 to 100 (salt 60 to 120; tablets 80 to 120)80 (tablets 100)
CYA, outdoor30 to 60 (salt 60 to 90)40 (salt 70)
CYA, indoor0 to 20no stabilizer
Calcium, plaster250 to 650300
Calcium, vinylnone needed–

Chlorine: Trouble Free Pool's chlorine/CYA chart, the same as our chlorine calculator. pH: 7.6 sits in both the 7.4 to 7.6 health departments call ideal and Trouble Free Pool's 7.6 to 7.8. TA and CYA: as in our alkalinity and stabilizer calculators. Calcium: Trouble Free Pool gives 250 to 650 for plaster and fiberglass and none for vinyl; the industry standard (ANSI/APSP-11) gives 200 to 400 as ideal, so we raise it to 300, inside both.

How long to wait between chemicals

  • Between different chemicals: one at a time, pump running. Trouble Free Pool forum members find 30 minutes enough; Leslie's asks for 4 hours between most additions unless the label says otherwise. Your labels decide.
  • Acid and chlorine: never one straight after the other. Mixed, they give off chlorine gas.
  • Calcium: not on the same day as soda ash or alkalinity increaser (baking soda), per Leslie's, and only once pH is in range.
  • Stabilizer: test CYA a day after the last of it dissolves, often 2 to 3 days. The test lags behind.
  • Swimming: when each label allows. Many chlorine labels say no swimming above 4 ppm.

Pool chemical safety

  • Read the product label first. When the label and a calculator disagree, follow the label, including the most you may add at one time.
  • Never mix chemicals, dry or wet, and never put two in the same scoop or bucket. Acid and chlorine release chlorine gas. Cal-hypo and trichlor tablets can catch fire or explode if they touch.
  • Keep feeders and skimmers for one chemical. Never put cal-hypo or anything else in a tablet feeder.
  • Chemical into water, never water onto chemical. Dissolve cal-hypo, dichlor and calcium chloride in a bucket of pool water first; undissolved granules can bleach vinyl, and calcium chloride gets hot.
  • Acid goes into water. If you dilute muriatic acid, pour the acid into a bucket of water, never the other way round.
  • Gloves and eye protection, and stand upwind when you pour.
  • Store chemicals apart, dry, and out of reach of children and pets.

Testing tips

A plan is only as good as the readings. A drop kit with an FAS-DPD chlorine test is far more reliable for working out doses than test strips. Above 10 ppm of chlorine, the usual pH test reads too high. Strips often show total hardness rather than calcium hardness. If a dose comes out far off what you expected, check the pool volume first: a 10% error in gallons is a 10% error in every dose.

Questions

What order should I add pool chemicals in?

Alkalinity, then pH, then calcium, with chlorine late in the day, apart from any acid. Start stabilizer early because it is slow. If chlorine is near zero, add it first.

Can I add all my pool chemicals at the same time?

No. Add them one at a time with the pump running, never mixed. Acid and chlorine are the dangerous pair: kept apart in time, both are fine in the same pool.

Why did my pH change after I added baking soda or stabilizer?

Baking soda pulls pH up a little, toward about 8.3. Stabilizer is cyanuric acid, so it pulls pH down as it dissolves. That is why this calculator works the steps out in order.

Do I need to test everything every time?

No. Free chlorine and pH change daily; TA weekly; CYA and calcium change slowly, so monthly is usually enough. Leave the boxes you did not test empty: the plan covers what you entered.

Why is the calcium split into doses?

One calcium chloride label we checked asks for anything over 3 lb per 10,000 gallons to go in at least 12 hours apart, to avoid clouding. Other labels allow more at once; follow yours.

Sources

Last checked November 23, 2026. Always follow the label on your chemicals.

Related calculators

Plan–